The customer has a draft where the front view is linked to a configuration in the 3D assembly.
After changing the configuration in 3D, the draft view is not indicated as out of date.
Original 3D configuration:
New 3D Configuration:
Draft front view does not show as out of date:
It is necessary to manually check and apply the new configuration within the Drawing View properties.
Is there a way to get the Drawing View to automatically show that it is out of date when the configuration changes?
SolutionTo force the Drawing View to indicate that it is out of date when the 3D configuration has changed it is necessary to activate the following General option: