How to add some new parameter such as Cutting Time, Bending Time etc. in Design for Cost table?
Solution
Cutting Time, Bending Time are not direct Costing variables.
User has to consider his man hour in terms of cost per operation.
For example:
Man hour cost for per bend to be considered while defining Bend operation basic cost i.e. cost per bend and similarly for Cut operation too.
Or can add the man hour cost per component towards 'Other' operations.
User can create custom variable for time and input the value in variable table but column could not be added in Design for Cost for calculating basic cost of the component.
Hope this may help.