Solid Edge
Using SEEC_Synchronize_ItemNumbers to Synchronize Find Number and Item Number between Solid Edge and Teamcenter
2021-10-06T23:58:10Z
DOC_MANAGEMENT
Summary
Details
How do I synchronize the Teamcenter Find Number with the Solid Edge Item Number?
Solution
Configuration Teamcenter
Synchronization between the Solid Edge Item Number and Teamcenter Find Number can be accomplished by using two Teamcenter preferences:
SEEC_BOM_Synchronize =TRUE
SEEC_Synchronize_ItemNumbers = TRUE
The synchronization is between Teamcenter and the Sold Edge Assembly occurrences. When the Item numbers are required on the Solid Edge draft an additional setting on the parts list properties is needed to use the assembly generated Item Numbers
Configuration Solid Edge (Parts List drawing) The behavior of the Item synchronization is controlled by the switches of the preference SEEC_Synchronize_ItemNumbers. This preference controls all settings on the Solid Edge Options form for the Item Numbers. (On an assembly Application -> Settings-> Options -> Item Numbers)
SEEC_Synchronize_ItemNumbers = TRUE will switch-on the "Maintain item Numbers" /Method= (value 1-4) will control the level of synchronization where:
Method=1 is the Top Level only Method=2 is Atomic – top down Method=3 is Exploded – top down Method=4 is Exploded – Use Level base numbers
The other parameters are used to control the numbering, uniqueness and weldments.
Hardware/Software Configuration
Platform: INTL64 OS: windows OS Version: 1064 Product: SOLID_EDGE Application: DOC_MANAGEMENT Version: V221.0 Function: SEEC