NX MCD: How to assign time to motion sequence, with automatic speed calculation (time-based operation)?

2021-10-06T23:27:22Z
NX for Design

Summary


Details

How to assign time to motion sequence in an operation, with automatic speed calculation?
How to create a time-based operation?



Solution

Edit speed form "default value for speed" to "Auto Calculate", which means the speed is calculated automatically:




For this select MB3 on the value-cell and choose "Auto Calculate" from dropdown list. 
Then you can set the time, and the speed is calculated accordingly.



Notes and References


Tdoc:
Mechatronics Concept Designer >
 - Assigning, changing and controlling properties  >
   - Creating time-based and event-based behaviors  >
     -  Create a time-based operation.
https://docs.plm.automation.siemens.com/tdoc/nx/12.0.2/nx_help/#uid:index_mechatronics:xid896264:id1101473:id1109426

Hardware/Software Configuration

Platform: INTEL
OS: windows
OS Version: 1064
Product: NX
Application: MECHATRONICS
Version: V12.0.2
Function: PROCEDURE

Ref: 001-9504393

KB Article ID# PL8014312

Contents

SummaryDetails

Associated Components

Mechatronics Concept Designer