NX Copying UDE's from One CAM Operation to Another

2019-04-22T15:14:59Z
NX for Manufacturing

Summary


Details

A series of UDE's were added to an operation in the Machine Control Start or End of Path Events in one operation and need to be copied to a second. The UDE's in the source operation might look something like the picture below.


Solution

 To copy the group of UDE's from one operation to a different operation in the same part, select Machine Control(Pane) -> Copy from... -> From -> Operation and click the operation to copy from.
If a second part file is opened as a template then this file will be listed when Machine Control(Pane) -> Copy from... -> From -> Template is selected.


Notes and References


Hardware/Software Configuration

Platform: all
OS: n/a
OS Version: n/a
Product: NX
Application: CAM
Version: V1859
Function: BASIC_FUNCTIONS

Ref: 001-8845866

KB Article ID# PL8010889

Contents

SummaryDetails

Associated Components

Manufacturing General