Is it possible to only select some of the PMI entities that have been created for a part when running Link to PMI? The intent is to only select the PMI entities that will be checked in a given setup.
Solution
The Link to PMI button is either all or nothing. There are no other controls in PMI which could be used to limit which PMI is selected when Link to PMI is run.
Notes