When sending the results data from the Laminate Post Report to excel for 150
subcases, excel will only generate 28 tabs plus the summary tab (for a total
of 29 tabs). Why doesn't excel generate 150 tabs, one for each subcase plus
the summary tab?
Solution
There is a current limitation of 29 total tabs when sending data from Laminate
Post Report to an Excel Spreadsheet. The workaround is to generate a CSV file
and import that into Excel. The limitation will be resolved in a later
release of Simcenter. Note: The summary tab correctly identifies the critical
subcase, regardless of whether or not it's part of the 29 first subcases.
Notes