Although the numerical value of PMI is assigned to the value of Nominal, the vectors does not match and inconsistency occurs in the data output by the postprocess.
Solution
In order for Coordinate Dimension to work properly, the Inspection Setup must have an MCS Alignment CSYS defined at the same location of the Ordinate Dimension origin CSYS.
Notes