How do I set up and use the integration with Opcenter APS?
Opcenter Scheduling SMT can obtain work order and calendar information automatically from Opcenter APS and provides Opcenter APS with the schedule for SMT production lines.
For best experience set up a matching Opcenter Scheduling SMT project file.
The topics below provide a chronological guide for how to get started using the integration with Opcenter APS.
Topic 1
Set options for integration with Opcenter APS
Topic 2
Optimize SMT Data for Opcenter APS