This video demonstrates setup transistor level EMIR analysis scenario and run mPower from Calibre Interactive GUI in Calibre 2023.1 release.
Siemens announced the release of our mPower solution for Electro migration and IR drop analysis in September of 2021.
This video demonstrates setup transistor level EMIR analysis scenario and how to run mPower from Calibre Interactive GUI with Calibre 2023.1 release.